Kingsway Temporary Works

Kingsway Temporary Works

As part of our wide spread modifications at Kingsway, SD Structures took a lead in the design of the temporary works enabling the removal of a number of columns below the Grade 2 Listed building on this Historic Kingsway in the heart of the West End

Hydraulic flat jacks were utilised to ensure the existing 7 storey building could be lifted free of the existing column prior to re supporting on a new moment frame.